by Jodie James Elliott, 2013
The bumpy transition from street to parking lot is completely devoid of any attempt by hired contractor to merge the two planes seamlessly. Instead, there is a gap chopped out of the preexisting curb only to be confronted by a newer, lower curb about two and a half inches high. In the centre of this entrance/gap, the municipal side of the awkward border dips just enough to compel water, and anything else that moves, into the direction of a storm drain, covered by a grate designed to keep anything wider than a bicycle tire from entering the city’s bowels.
(more…)